Project Code : IS2423
Job Title : CONCRETE CORING AND SLAB TEST FOR MMC NEW BODYSHOP
Purchase Order Status : P.O RECEIVED
Name of Coordinator : MOHAMAD IZUAN BIN IZZUDIN
Subcontractor / Supplier : Tp Geotechnic Sdn Bhd
Project Update / Real Time Status : jotform_untitled_markdownProject: IS2423 Date: 19/4/2024 PIC: Izuan, Firdaus, TP Geotechnique coring team, Hicom PFM, Firdaus (MMC) Progress: 1. Method of statement was sent to mmc Shauqy and Hicom side. 2. All 6 concrete coring point were done. 3. First 4-point C1 to C4 were drilled until 5-inch height and for C5 and C6 were drilled through all until found subgrade/soil layer base (6 to-7 inch height) 4. Point C6 was shifted 1.2m to the left following Hicom PFM suggestion. 5. All hole was covered with sika cement and all working places was cleaned.
PROJECT STATUS : PROJECT IN PROGRESS
EXPECTED PROJECT COMPLETION : CW-1 May 2024
UPLOAD FILES/PICTURE : Coring Concrete location at B24.pdf
IMG-20240419-WA0012.jpg
IMG-20240419-WA0015.jpg
IMG-20240419-WA0020.jpg
WhatsApp Image 2024-04-19 at 11.17.39_45bb5c49.jpg
Date : 2024-04-19